MARKET
PACKAGING INFORMATION

Stock# Size MSDS.
MSDS Language Pref:
CASE STUDIES
Adhesive Mounting of Transmitter
Agitator Repair
Airport Runway Repair
Anti-skid Loading Dock / Floor
Auger Repair
Bag House Tube Sheet Repair
Ball Mill Infeed Shell / Head Repair
Bearing Race Repair
Bearing Race Repair
Chute Lining Repair
Coal Crusher Repair
Coal Pipe Elbow Repair
Coal Pulverizer Repair
Concrete Pump Pad Repair
Concrete Repair
Cone Valve Repair
Conveyor Belt / Pulley Lagging Repair
Conveyor Belt Repair
Conveyor Belt Repair
Coupling Bolt Repair
Devcon® R-Flex® Belt Repair
Devcon® R-Flex® Repair of 5ft Long Belt Tear
Expansion Joint Repair
Expansion Joint Repair
Exterior Pipe Repair
Fan Housing Repair
Feed Bowl Repair
Filter Plate Repair
Floatation Cell Repair
Floatation Cell Repair
Floor Coating
Floor Coating
Floor Coating
Floor Coating
Floor Coating
Floor Coating
Floor Repair
Floor Repair
Floor Repair
Floor Repair
Floor Repair Acid Environment
Hydraulic Hose Repair
Hydraulic Hose Repair
Paddle Wheel Shaft / Hub Repair
Paper Machine Component Repair
Power Pole Repair
Pump Impeller Repair
Pump Repair
Pump Repair
Pump Repair
Pump Repair
Rebuilding Motor Pad
Rebuilding Pump Pads
Rebuilding Wood Block Flooring
Rubber Roll Repair
Stainless Steel Turbine Runner Repair
Stamping Press Alignment Repair
Steel Conveyor Roll Repair
Transformer Oil Leak Repair
Transformer Oil Leak Repair
Transformer Oil Leak Repair
Urethane Wear Ring Repair
Valve Repair
Valve Repair
Water Box Channel Repair
Water Box Channel Repair
Airport Runway Repair
Back to
 
Application Date: 
 
7/20/92
Customer:
 
Transport Canada Northbay Air Terminal
Industry:
 
Transportation Air Terminal
Associated Products:
Ultra Quartz™

 
Problem:
The broken concrete on the aprons at this air terminal required immediate repair. Loose concrete could easily damage aircraft engines, windshields and other critical components. Previous method of repair was to apply cold tar to damaged areas. Cold tar offered only a temporary repair often failing after only 3 to 4 months of service.
 
Solution:
All loose concrete was mechanically chipped away. Remaining solid concrete was roughened to provide a profile. Repair area was then chemically cleaned using Cleaner Blend 300. Ultra Quartz was applied using a concrete trowel replacing all missing concrete. Acetone was used as a thinning agent to smooth, blend and feather Ultra Quartz following gel point. Customer now uses Floor Patch Fast Cure (90 minute functional cure) to reduce runway downtime.