MARKET
PACKAGING INFORMATION

Stock# Size MSDS.
MSDS Language Pref:
CASE STUDIES
Adhesive Mounting of Transmitter
Agitator Repair
Airport Runway Repair
Anti-skid Loading Dock / Floor
Auger Repair
Bag House Tube Sheet Repair
Ball Mill Infeed Shell / Head Repair
Bearing Race Repair
Bearing Race Repair
Chute Lining Repair
Coal Crusher Repair
Coal Pipe Elbow Repair
Coal Pulverizer Repair
Concrete Pump Pad Repair
Concrete Repair
Cone Valve Repair
Conveyor Belt / Pulley Lagging Repair
Conveyor Belt Repair
Conveyor Belt Repair
Coupling Bolt Repair
Devcon® R-Flex® Belt Repair
Devcon® R-Flex® Repair of 5ft Long Belt Tear
Expansion Joint Repair
Expansion Joint Repair
Exterior Pipe Repair
Fan Housing Repair
Feed Bowl Repair
Filter Plate Repair
Floatation Cell Repair
Floatation Cell Repair
Floor Coating
Floor Coating
Floor Coating
Floor Coating
Floor Coating
Floor Coating
Floor Repair
Floor Repair
Floor Repair
Floor Repair
Floor Repair Acid Environment
Hydraulic Hose Repair
Hydraulic Hose Repair
Paddle Wheel Shaft / Hub Repair
Paper Machine Component Repair
Power Pole Repair
Pump Impeller Repair
Pump Repair
Pump Repair
Pump Repair
Pump Repair
Rebuilding Motor Pad
Rebuilding Pump Pads
Rebuilding Wood Block Flooring
Rubber Roll Repair
Stainless Steel Turbine Runner Repair
Stamping Press Alignment Repair
Steel Conveyor Roll Repair
Transformer Oil Leak Repair
Transformer Oil Leak Repair
Transformer Oil Leak Repair
Urethane Wear Ring Repair
Valve Repair
Valve Repair
Water Box Channel Repair
Water Box Channel Repair
Water Box Channel Repair
Back to
 
Application Date: 
 
1/10/91
Customer:
 
Baltimore Gas and Electric
Industry:
 
Utility Power Generation
Associated Products:
Plastic Steel® Putty (A)
Titanium Putty

 
Problem:
These water box channels would receive extreme corrosive wear from processing salt water. The wear was so sever that the channel boxes required immediate replacement. Due to equipment age, replacement parts were no longer available.
 
Solution:
Complete repair areas were sandblasted to a SSPC-SP5 white metal finish. Surfaces were chemically cleaned using Cleaner Blend 300. Titanium was applied up to 65 mils over original specification or dimension. Following a 6 hour cure of Titanium Putty, the channel was machined back to within original specifications or dimension. Minor imperfections were repaired using Titanium Putty, then re-machined following a 4 hour cure.