CASE STUDIES
Adhesive Mounting of Transmitter
Agitator Repair
Airport Runway Repair
Anti-skid Loading Dock / Floor
Auger Repair
Bag House Tube Sheet Repair
Ball Mill Infeed Shell / Head Repair
Bearing Race Repair
Bearing Race Repair
Chute Lining Repair
Coal Crusher Repair
Coal Pipe Elbow Repair
Coal Pulverizer Repair
Concrete Pump Pad Repair
Concrete Repair
Cone Valve Repair
Conveyor Belt / Pulley Lagging Repair
Conveyor Belt Repair
Conveyor Belt Repair
Coupling Bolt Repair
Devcon® R-Flex® Belt Repair
Devcon® R-Flex® Repair of 5ft Long Belt Tear
Expansion Joint Repair
Expansion Joint Repair
Exterior Pipe Repair
Fan Housing Repair
Feed Bowl Repair
Filter Plate Repair
Floatation Cell Repair
Floatation Cell Repair
Floor Coating
Floor Coating
Floor Coating
Floor Coating
Floor Coating
Floor Coating
Floor Repair
Floor Repair
Floor Repair
Floor Repair
Floor Repair Acid Environment
Hydraulic Hose Repair
Hydraulic Hose Repair
Paddle Wheel Shaft / Hub Repair
Paper Machine Component Repair
Power Pole Repair
Pump Impeller Repair
Pump Repair
Pump Repair
Pump Repair
Pump Repair
Rebuilding Motor Pad
Rebuilding Pump Pads
Rebuilding Wood Block Flooring
Rubber Roll Repair
Stainless Steel Turbine Runner Repair
Stamping Press Alignment Repair
Steel Conveyor Roll Repair
Transformer Oil Leak Repair
Transformer Oil Leak Repair
Transformer Oil Leak Repair
Urethane Wear Ring Repair
Valve Repair
Valve Repair
Water Box Channel Repair
Water Box Channel Repair
Transformer Oil Leak Repair
Back to
 
Application Date: 
 
4/3/95
Customer:
 
Tucson Electric Power
Industry:
 
Utility Power Distribution
Associated Products:
1 Minute™ Epoxy

 
Problem:
Weld porosity's caused seeping oil leaks from this substation transformer. The past repair procedure was to drain the oil from the tank and re-weld. This repair process was expensive and caused long term power outages.
 
Solution:
Repair or leak areas were roughened using a grinder. One Minute Epoxy was applied using the Mark 5 Auto Mix System to plug all active leaks. Following confirmation that all oil leaks had been stopped, repair areas were then chemically cleaned using Cleaner Blend 300. Fasmetal was then applied directly over the One Minute Epoxy to a thickness of 1/4, extending beyond the One Minute Epoxy by 3mm. Following Fasmetal's 1 hour cure, repair areas were primed using both FL10 and FL20 Primers. Each primer was allowed to cure or dry for 15 minutes. Using both primers on metal substrates will improve adhesion from 25 pli to 50 pli. Two primer system is always recommended in wet or outdoor operating conditions. Flexane 80 Putty was applied over the Fasmetal to a thickness of 1/4" extending beyond by 3 inches.. Flexane 80 Putty encapsulated the repair area as a flexible, (350% elongation), vibration and climate resistant permanent seal.