MARKET
PACKAGING INFORMATION

Stock# Size MSDS.
MSDS Language Pref:
CASE STUDIES
Adhesive Mounting of Transmitter
Agitator Repair
Airport Runway Repair
Anti-skid Loading Dock / Floor
Auger Repair
Bag House Tube Sheet Repair
Ball Mill Infeed Shell / Head Repair
Bearing Race Repair
Bearing Race Repair
Chute Lining Repair
Coal Crusher Repair
Coal Pipe Elbow Repair
Coal Pulverizer Repair
Concrete Pump Pad Repair
Concrete Repair
Cone Valve Repair
Conveyor Belt / Pulley Lagging Repair
Conveyor Belt Repair
Conveyor Belt Repair
Coupling Bolt Repair
Devcon® R-Flex® Belt Repair
Devcon® R-Flex® Repair of 5ft Long Belt Tear
Expansion Joint Repair
Expansion Joint Repair
Exterior Pipe Repair
Fan Housing Repair
Feed Bowl Repair
Filter Plate Repair
Floatation Cell Repair
Floatation Cell Repair
Floor Coating
Floor Coating
Floor Coating
Floor Coating
Floor Coating
Floor Coating
Floor Repair
Floor Repair
Floor Repair
Floor Repair
Floor Repair Acid Environment
Hydraulic Hose Repair
Hydraulic Hose Repair
Paddle Wheel Shaft / Hub Repair
Paper Machine Component Repair
Power Pole Repair
Pump Impeller Repair
Pump Repair
Pump Repair
Pump Repair
Pump Repair
Rebuilding Motor Pad
Rebuilding Pump Pads
Rebuilding Wood Block Flooring
Rubber Roll Repair
Stainless Steel Turbine Runner Repair
Stamping Press Alignment Repair
Steel Conveyor Roll Repair
Transformer Oil Leak Repair
Transformer Oil Leak Repair
Transformer Oil Leak Repair
Urethane Wear Ring Repair
Valve Repair
Valve Repair
Water Box Channel Repair
Water Box Channel Repair
Concrete Pump Pad Repair
Back to
 
Application Date: 
 
33820
Customer:
 
Laurel Maintenance
Industry:
 
Pulp and Paper Manufacturing
Associated Products:
Floor Patch™

 
Problem:
A combination of vibration and chemical leakage over several years of service had loosened and eroded this pump pad's concrete. Previous repair method involved pouring new concrete, however it never achieved good bond strength and also provided poor chemical resistance.
 
Solution:
The concrete surface was sandblasted to remove loose concrete and create a rough profile. Devcon Release Agent was generously applied to the pump mounting base for easy removal or separation.Floor Patch™ was applied to the worn concrete. The pump mounting base was set and leveled on top of the uncured Floor Patch™. Fasteners were pushed through the pump mounting base into the uncured Floor Patch™. Following a full cure (24 hours), the pump mounting fasteners were tightened.
 



The pump mounting base is set and leveled on top of the uncured Floor Patch™.

Fasteners are pushed through the pump mounting base into the uncured Floor Patch™.

The pump mounting fasteners are tightened.