MARKET
PACKAGING INFORMATION

Stock# Size MSDS.
MSDS Language Pref:
CASE STUDIES
Adhesive Mounting of Transmitter
Agitator Repair
Airport Runway Repair
Anti-skid Loading Dock / Floor
Auger Repair
Bag House Tube Sheet Repair
Ball Mill Infeed Shell / Head Repair
Bearing Race Repair
Bearing Race Repair
Chute Lining Repair
Coal Crusher Repair
Coal Pipe Elbow Repair
Coal Pulverizer Repair
Concrete Pump Pad Repair
Concrete Repair
Cone Valve Repair
Conveyor Belt / Pulley Lagging Repair
Conveyor Belt Repair
Conveyor Belt Repair
Coupling Bolt Repair
Devcon® R-Flex® Belt Repair
Devcon® R-Flex® Repair of 5ft Long Belt Tear
Expansion Joint Repair
Expansion Joint Repair
Exterior Pipe Repair
Fan Housing Repair
Feed Bowl Repair
Filter Plate Repair
Floatation Cell Repair
Floatation Cell Repair
Floor Coating
Floor Coating
Floor Coating
Floor Coating
Floor Coating
Floor Coating
Floor Repair
Floor Repair
Floor Repair
Floor Repair
Floor Repair Acid Environment
Hydraulic Hose Repair
Hydraulic Hose Repair
Paddle Wheel Shaft / Hub Repair
Paper Machine Component Repair
Power Pole Repair
Pump Impeller Repair
Pump Repair
Pump Repair
Pump Repair
Pump Repair
Rebuilding Motor Pad
Rebuilding Pump Pads
Rebuilding Wood Block Flooring
Rubber Roll Repair
Stainless Steel Turbine Runner Repair
Stamping Press Alignment Repair
Steel Conveyor Roll Repair
Transformer Oil Leak Repair
Transformer Oil Leak Repair
Transformer Oil Leak Repair
Urethane Wear Ring Repair
Valve Repair
Valve Repair
Water Box Channel Repair
Water Box Channel Repair
Stainless Steel Turbine Runner Repair
Back to
 
Application Date: 
 
2/18/95
Customer:
 
Ontario Hydro Saunders Generating Station
Industry:
 
Utility Power Generation
Associated Products:
Epoxy Coat™ 7000 AR

 
Problem:
These turbine runners would receive extreme cavitation wear from the high volume flow of water. Cavitation on runners causes secondary problems such as vibration and off balancing. Runner replacement cost was estimated to be 50K
 
Solution:
The complete repair area was first roughened using a grinder and wire wheel attachment. Repair surfaces were then chemically cleaned using Cleaner Blend 300. Ceramic Repair Putty was applied rebuilding missing eroded metal. Ceramic Repair Putty was smoothed and feathered using acetone following gel point. Following a full cure of Ceramic Repair Putty, (16 hours), Ceramic Repair Putty was sanded to a smooth finish. Devcon's repair cost was 400.00.