MARKET
PACKAGING INFORMATION

Stock# Size MSDS.
MSDS Language Pref:
CASE STUDIES
Adhesive Mounting of Transmitter
Agitator Repair
Airport Runway Repair
Anti-skid Loading Dock / Floor
Auger Repair
Bag House Tube Sheet Repair
Ball Mill Infeed Shell / Head Repair
Bearing Race Repair
Bearing Race Repair
Chute Lining Repair
Coal Crusher Repair
Coal Pipe Elbow Repair
Coal Pulverizer Repair
Concrete Pump Pad Repair
Concrete Repair
Cone Valve Repair
Conveyor Belt / Pulley Lagging Repair
Conveyor Belt Repair
Conveyor Belt Repair
Coupling Bolt Repair
Devcon® R-Flex® Belt Repair
Devcon® R-Flex® Repair of 5ft Long Belt Tear
Expansion Joint Repair
Expansion Joint Repair
Exterior Pipe Repair
Fan Housing Repair
Feed Bowl Repair
Filter Plate Repair
Floatation Cell Repair
Floatation Cell Repair
Floor Coating
Floor Coating
Floor Coating
Floor Coating
Floor Coating
Floor Coating
Floor Repair
Floor Repair
Floor Repair
Floor Repair
Floor Repair Acid Environment
Hydraulic Hose Repair
Hydraulic Hose Repair
Paddle Wheel Shaft / Hub Repair
Paper Machine Component Repair
Power Pole Repair
Pump Impeller Repair
Pump Repair
Pump Repair
Pump Repair
Pump Repair
Rebuilding Motor Pad
Rebuilding Pump Pads
Rebuilding Wood Block Flooring
Rubber Roll Repair
Stainless Steel Turbine Runner Repair
Stamping Press Alignment Repair
Steel Conveyor Roll Repair
Transformer Oil Leak Repair
Transformer Oil Leak Repair
Transformer Oil Leak Repair
Urethane Wear Ring Repair
Valve Repair
Valve Repair
Water Box Channel Repair
Water Box Channel Repair
Floor Repair
Back to
 
Application Date: 
 
8/23/96
Customer:
 
Certified Foods
Industry:
 
Agriculture Food Processing
Associated Products:
Flexane® Fast-Cure Rubber Repair Putty

 
Problem:
Over several years of service, water contamination and traffic have caused the concrete to become spalled and eroded. Corrosion has also caused the handrail to become dislodged from the concrete.
 
Solution:
Loose concrete was removed using a grinder and wire wheel attachment. Solid concrete was then roughened. Forms were manufactured from metal and placed into position around the repair areas. Duct tape was used to hold the forms in place. Devcon's Release Agent was applied to the forms for easy removal following partial cure of Floor Patch Fast Cure. Release agent must be used for easy part or form removal. An oversized metal pipe extension was positioned around the existing rail. Wood wedges were positioned to center the rail within the pipe extension. Floor Patch Fast Cure, (90 minute functional cure), was applied to rebuild missing concrete. Following a partial cure of Floor Patch fast Cure, (15 minutes), the metal forms were removed. FL10 Primer was applied to the metal rail and pipe. Flexane 80 Liquid Fast Cure, (90 minute functional cure), was injected as a flexible filler between the pipe and rail. Flexane 80 Liquid will remain flexible, (350% elongation), while resisting freeze thaw cycles caused by seasonal weather changes.